Plan
Define the house and material requirements.
Construction command, house-level material requirements and warehouse activity in one operational workspace.
Construction teams need to connect what each house requires with what the warehouse can actually supply. Receiving, issuing and delivery all need to refer to the same material demand.
Stratus OS connects construction command with house and material control, stock visibility, receiving, issuing and dispatch. The application is organized around the physical movement of materials and the people responsible for each handoff.
The application is structured around a sequence of operational decisions.
Define the house and material requirements.
Compare demand with warehouse stock.
Coordinate receiving and material issue.
Connect dispatch with the work on site.
Three connected capabilities that support the workflow.
Review projects and house-level work in a shared command view.
Connect requirements with stock, receiving and issue activity.
Carry the operational context into the delivery handoff.
The workspace makes the relationship between construction demand and material movement visible. The demonstration shows the application flow; rollout scope and integrations are defined for each engagement.
Start with a demonstration project, review a house requirement and follow the material workflow through warehouse and dispatch views.
Start a conversation ↗